From concept to completion, Beaver Bridges offers end-to-end services for permanent and temporary bridge projects. Whether you're planning new infrastructure or upgrading existing assets, our in-house teams deliver compliant, cost-effective, and future-ready solutions — on time, every time.
From national infrastructure to private developments, Beaver Bridges supports a wide range of sectors with bespoke bridging solutions. Our experience spans highways, rail, energy, and public sector projects — as well as private estates and commercial schemes. Wherever your project sits, we have the tools, talent, and track record to deliver.
Explore the wide range of bridge solutions delivered by Beaver Bridges. We design and build both permanent and temporary structures for projects of all sizes. With strong engineering expertise and a practical approach, we provide safe, reliable and compliant bridge systems tailored to each project’s needs and environment.
From remote landscapes to live rail environments, Beaver Bridges thrives in complex settings where others hesitate. Our in-house team brings together decades of engineering expertise, ensuring we meet challenges head-on — safely, sustainably, and without compromise.
Once removed, we were required to install a Matiere Unibridge, including the structure. The replacement Matiere Unibridge was 22m x 4.5m complete with kerbs and specified additional diaphragm.
Beaver Bridges planned, managed and monitored the works and subcontractors required for this project. We ensured that a construction phase plan was developed, outlining the key health and safety aspects of the project. This included ensuring suitable welfare facilities were provided and maintained throughout the project. Beaver Bridges kept the client up to date with any programme changes and sought approval where required.
As Prime Contractor, we had responsibility for ensuring that all workers had a site-specific induction. All workers had the specific skills, knowledge, experience and training to carry out the works or were engaged in obtaining them.
We stripped off the deck of the existing and set aside for re-use. The steel beams were removed and moved to a storage area. We then built up and installed the new unibridge, utilising the existing foundations and additional bearing position.
The Matiere Unibridge was excellent for this type of site, extremely robust and durable. The structures are calculated according to Eurocodes and British Standards. The structure can be used for temporary or permanent requirements – it’s a simple industrial system, strong, easily transportable, quickly assembled and is capable of loads in excess of 300 tonnes when used in a clear span configuration.