Stronelairg Wind Farm Vehicle Bridge – Scotland, Highland

Programme

Off-loading and installation of the bridge was carried out using the suspended load method, in this instance using two 360 excavators in tandem lift configuration.

The bridge which came in 2-sections was successfully delivered on time and fixed into position by Beaver Bridges Ltd.

OUR CORE VALUES

Understand Our Clients
Deliver On Time And on Budget
Show Our Passion
Think Differently And Innovate
Learn Continuously
Communicate Openly
Seek Feedback
Everyone Home Safe Every Day
Maximum Effort
Enquire Now
Would you like to know more? Fill in the form below and a member of our team will contact you shortly. Alternatively call us on 01743 811 811 or email us on info@beaverbridges.co.uk
  • Request a Call Back
Request a Survey