Steel Vehicle Bridge – Stronelairg Wind Farm, Highlands, Scotland

Programme

This first port of call for this project was to off-load the steel vehicle bridge, designed by Beaver Bridges. Once off-loaded, installation of the structure began. This was completed using the suspended load method, in this instance using two 360 excavators, operated in tandem lift configuration.

The designed vehicle bridge had been manufactured in two sections, to allow for more efficient installation. The delivery of the structures was on time, allowing for Beaver Bridges to commence work, and complete the full installation on time also. Working to our customers deadlines is of upmost importance to us, to ensure complete customer satisfaction.

OUR CORE VALUES

Understand Our Clients
Deliver On Time And on Budget
Show Our Passion
Think Differently And Innovate
Learn Continuously
Communicate Openly
Seek Feedback
Everyone Home Safe Every Day
Maximum Effort
Enquire Now
Would you like to know more? Fill in the form below and a member of our team will contact you shortly. Alternatively call us on 01743 811 811 or email us on info@beaverbridges.co.uk

      • Request a Call Back
      Beaver Bridges WCS ISO 14001 logo Beaver Bridges WCS ISO 45001 logo Beaver Bridges WCS ISO 9001 logo Beaver Bridges Avetta Logo Beaver Bridges Ceca logo Beaver Bridges Made in Britain logo Beaver Bridges CHAS Beaver Bridges Constructionline logo Beaver Bridges SCCS logo Beaver Bridges FORS logo Beaver Bridges Risqs logo
      Request a Survey