SSE Vehicle Bridge – Inverness, Scotland

Programme

The working programme required the following tasks; excavation works, bridge foundations, use of a crane lift, build of the bridge and finally, installation.

The new vehicle bridge structure was a single span steel monocoque construction with load distribution through deck plates above and below the main structural members. It was installed on concrete foundations which were constructed of pre-cast blocks built up to 4m high. The bridge itself consisted of two 9m long x 3m wide bridge decks complete with demountable handrails.  Each deck was positioned to ensure wheel loads from delivery vehicles were best spread through each bridge section for complete safety and structure integrity. The site work was safely and efficiently completed 7 days

Beaver Bridges supplied all resources for this project, including staff, required machinery, equipment, tools and materials for these works. Working to a clients timelines and budgets is of upmost importance to us to ensure customer satisfaction and this project was completed successfully, on time and in a professional manner.

OUR CORE VALUES

Understand Our Clients
Deliver On Time And on Budget
Show Our Passion
Think Differently And Innovate
Learn Continuously
Communicate Openly
Seek Feedback
Everyone Home Safe Every Day
Maximum Effort
Enquire Now
Would you like to know more? Fill in the form below and a member of our team will contact you shortly. Alternatively call us on 01743 811 811 or email us on info@beaverbridges.co.uk

      • Request a Call Back
      Beaver Bridges WCS ISO 14001 logo Beaver Bridges WCS ISO 45001 logo Beaver Bridges WCS ISO 9001 logo Beaver Bridges Avetta Logo Beaver Bridges Ceca logo Beaver Bridges Made in Britain logo Beaver Bridges CHAS Beaver Bridges Constructionline logo Beaver Bridges SCCS logo Beaver Bridges FORS logo Beaver Bridges Risqs logo
      Request a Survey