Newton Blossomville – England, Milton Keynes

Programme

 

The Structure

The structures were craned using a 300te grove.   The bridges were uniform in finish.  The 36m, 18.7m and 5m structures were constructed in steel and timber, all steelwork coated with HA Type II alternative paint system, FSC hardwood and all fixings galvanised.  Environmental and ecology were other factors carefully managed, e.g. the presence of otters, bats and newts.

All criteria were met, on time and performed safely.