Minnygap wind Farm – England, Cornwall

Programme

BB planned, managed and monitored the works and subcontractors. We ensured that a construction phase plan was developed outling the key H&S aspects of the project, including suitable welfare facilities were provided and maintained throughout the project. BB kept the client up to date with any programme changes and sought approval where required.
As Prime Contractor, we had responsibility for ensuring that all workers had a site-specific induction. All workers had the specific skills, knowledge, experience and training to carry out the works or were engaged in obtaining them.

We stripped off the deck of the existing and set aside for re-use. The steel beams were removed and moved to a storage area.
We then built up and installed the new unibridge, utilising the existing foundations and additional bearing position.
The Matiere Unibridge was excellent for this type of site, extremely robust and durable. The structures are calculated according to Eurocodes and British Standards.

structure can be used for temporary or permanent requirements. It is a simple industrial system, strong, easily transportable, quickly assembled and is capable of loads in excess of 300 tonnes when used in a clear span configuration.

OUR CORE VALUES

Understand Our Clients
Deliver On Time And on Budget
Show Our Passion
Think Differently And Innovate
Learn Continuously
Communicate Openly
Seek Feedback
Everyone Home Safe Every Day
Maximum Effort
Enquire Now
Would you like to know more? Fill in the form below and a member of our team will contact you shortly. Alternatively call us on 01743 811 811 or email us on info@beaverbridges.co.uk
  • Request a Call Back
Request a Survey