Congleton Morris Homes – England, Congleton

Programme

A new residential housing development was in its second stage when we were contacted by the Client as a Subcontractor to remove an existing structure, design and install new foundations, based on GI data provided by the Client.  In addtion we desiged, built and installed a new vehicle bridge with pedestrian walkways which linked completed phase one to phase two which was underway.  The already populated phase one meant that access to the site of the bridge was tight.  The crane was situated on the developed side and slung across the brook thus joining it to phase two.  A large tree stump had to be removed from the finished side of the development to prepare for the new mass concrete foundations.  Works on site began in December 2016 with the removal element and the project was completed in January 2017.  All men, plant, machinery and RAMs supplied by Beaver Bridges Ltd with a CPA Crane Hire.

All works were completed with safely, without any Health & Safety issues, with minimum disruption to residents and with sensitivity to the local environment.

OUR CORE VALUES

Understand Our Clients
Deliver On Time And on Budget
Show Our Passion
Think Differently And Innovate
Learn Continuously
Communicate Openly
Seek Feedback
Everyone Home Safe Every Day
Maximum Effort
Enquire Now
Would you like to know more? Fill in the form below and a member of our team will contact you shortly. Alternatively call us on 01743 811 811 or email us on info@beaverbridges.co.uk
  • Request a Call Back
Request a Survey