Vehicle Bridge HGV loading, Scottish Highlands

Programme

Off-loading and installation of the bridge was carried out using the suspended load method, in this instance using two 360 excavators in tandem lift configuration.

The bridge which came in 2-sections was successfully delivered on time and fixed into position by Beaver Bridges Ltd.

Enquire Now
Would you like to know more? Fill in the form below and a member of our team will contact you shortly. Alternatively call us on 01743 811 811 or email us on info@beaverbridges.co.uk
  • Request a Call Back
Request a Survey