Trecenydd Footbridge – Caerphilly, Wales

Programme

We worked with Caerphilly Council to develop the Construction Phase Plan and the methodology for carrying out the repairs. In addition to the resurfacing work the scope included structural steel repairs, preparation to Swedish standard SA2 of existing steel work and application of a Highways Agency compliant paint system over the entire footbridge and associated steel access ramps. Our goal was to minimise disruption to the public, adjacent land users and pedestrian and vehicular traffic. The works involved temporary traffic management and a temporary pedestrian route, temporary stairs, footway surface preparation & maintenance and pelican crossing. The works site was highly visible, being on a main traffic route and so supervision and security were a main concern. This was addressed in part by using Perimeter Intruder Detection equipment with remote monitoring. A twenty-four hour call-out system was also in place for the temporary traffic and pedestrian management arrangements.

OUR CORE VALUES

Understand Our Clients
Deliver On Time And on Budget
Show Our Passion
Think Differently And Innovate
Learn Continuously
Communicate Openly
Seek Feedback
Everyone Home Safe Every Day
Maximum Effort
Enquire Now
Would you like to know more? Fill in the form below and a member of our team will contact you shortly. Alternatively call us on 01743 811 811 or email us on info@beaverbridges.co.uk

      • Request a Call Back
      Beaver Bridges WCS ISO 14001 logo Beaver Bridges WCS ISO 45001 logo Beaver Bridges WCS ISO 9001 logo Beaver Bridges Avetta Logo Beaver Bridges Ceca logo Beaver Bridges Made in Britain logo Beaver Bridges CHAS Beaver Bridges Constructionline logo Beaver Bridges SCCS logo Beaver Bridges FORS logo Beaver Bridges Risqs logo
      Request a Survey