White Bridge Refurbishment – England, Surrey

Programme

The programme of works involved the erection of bird cage scaffolding to enclose the entire structure. The existing timber deck was then removed, and the steel was shot blasted to base material, and cleats welded. A Type II Alternative Paint System (RAL9010) was applied before finally, the fitting of a new hardwood timber deck was completed. As shown in our images, once the work was completed, the scaffolding was removed to reveal the new fully refurbished pedestrian footbridge.

The client was delighted with the end result.  The 30m x 1.5m structure was constructed completely from steel and with a painted finish and a timber non-slip deck.  The timber deck is manufactured from Ekki hardwood, grooved and has 3 non-slip inserts.

OUR CORE VALUES

Understand Our Clients
Deliver On Time And on Budget
Show Our Passion
Think Differently And Innovate
Learn Continuously
Communicate Openly
Seek Feedback
Everyone Home Safe Every Day
Maximum Effort
Enquire Now
Would you like to know more? Fill in the form below and a member of our team will contact you shortly. Alternatively call us on 01743 811 811 or email us on info@beaverbridges.co.uk

      • Request a Call Back
      Beaver Bridges WCS ISO 14001 logo Beaver Bridges WCS ISO 45001 logo Beaver Bridges WCS ISO 9001 logo Beaver Bridges Avetta Logo Beaver Bridges Ceca logo Beaver Bridges Made in Britain logo Beaver Bridges CHAS Beaver Bridges Constructionline logo Beaver Bridges SCCS logo Beaver Bridges FORS logo Beaver Bridges Risqs logo
      Request a Survey