Truss Bridge Replacement – Wisley Golf Club Woking, England

Programme

Our client’s need was urgent and Beaver Bridges had to react quickly with bridge design works to obtain approvals and then make early arrangements for permits and transport.

Due to the nature of the surroundings, thorough and robust arrangements had to be made for heavy vehicle access, and the protection of existing structures and high quality hard and soft landscaping. Over 300metres of Trackway ground protection was required, as was the careful assessment of an existing concrete bridge that was the only access to site. Beaver Bridges’ project team carried out a site survey and assessment and produced a lifting plan & method statement that addressed all elements of the project; this included environmental risks and those associated with works over water.

The end result is a truss bridge of which both Beaver Bridges and the client are very proud of.

OUR CORE VALUES

Understand Our Clients
Deliver On Time And on Budget
Show Our Passion
Think Differently And Innovate
Learn Continuously
Communicate Openly
Seek Feedback
Everyone Home Safe Every Day
Maximum Effort
Enquire Now
Would you like to know more? Fill in the form below and a member of our team will contact you shortly. Alternatively call us on 01743 811 811 or email us on info@beaverbridges.co.uk

      • Request a Call Back
      Beaver Bridges WCS ISO 14001 logo Beaver Bridges WCS ISO 45001 logo Beaver Bridges WCS ISO 9001 logo Beaver Bridges Avetta Logo Beaver Bridges Ceca logo Beaver Bridges Made in Britain logo Beaver Bridges CHAS Beaver Bridges Constructionline logo Beaver Bridges SCCS logo Beaver Bridges FORS logo Beaver Bridges Risqs logo
      Request a Survey