Fisher German Towcester Pedestrian Bridge – Northamptonshire, England

Programme

After successfully removing the old structure, an assessment of the footings took place to ensure they had not been damaged during the removal of the old pedestrian bridge. The new footbridge deck was delivered to site in one piece and set down within the compound area. The deck was fixed using a chemical anchor system, and it was slung into position to enable marking out and lining up holes for drilling. After the deck installation was complete, the parapets and rails were fitted to the pre-drilled holes and fixed securely.

The site was cleared of all plant and machinery. Any waste, materials and litter were disposed of in the skip provided leaving the site clean, tidy and safe. The Beaver Bridges team also worked hard to complete this project in a professional and safe manner, on budget, on time and to the client’s satisfaction.

OUR CORE VALUES

Understand Our Clients
Deliver On Time And on Budget
Show Our Passion
Think Differently And Innovate
Learn Continuously
Communicate Openly
Seek Feedback
Everyone Home Safe Every Day
Maximum Effort
Enquire Now
Would you like to know more? Fill in the form below and a member of our team will contact you shortly. Alternatively call us on 01743 811 811 or email us on info@beaverbridges.co.uk

      • Request a Call Back
      Beaver Bridges WCS ISO 14001 logo Beaver Bridges WCS ISO 45001 logo Beaver Bridges WCS ISO 9001 logo Beaver Bridges Avetta Logo Beaver Bridges Ceca logo Beaver Bridges Made in Britain logo Beaver Bridges CHAS Beaver Bridges Constructionline logo Beaver Bridges SCCS logo Beaver Bridges FORS logo Beaver Bridges Risqs logo
      Request a Survey