Timber Bridge – Salt Hill Park, Slough, England

Programme

In preparation for the installation, Beaver Bridges liaised with adjacent landowners and users of the nearby Salt Hill Activity Centre. This communication was vital to ensure the safe and meticulous planning of all vehicle movements on site during the installation.

Beaver Bridges prepared the site. The site also included trained plant operators and a banksman who controlled and guided all site plant and vehicles, including deliveries to site.

Thorough excavation was completed to the pre-determined level and checked with the client ahead of lifting the concrete blocks into the final position. The bridge was delivered in one piece, installed and fixed into position using a chemical anchors system.

OUR CORE VALUES

Understand Our Clients
Deliver On Time And on Budget
Show Our Passion
Think Differently And Innovate
Learn Continuously
Communicate Openly
Seek Feedback
Everyone Home Safe Every Day
Maximum Effort
Enquire Now
Would you like to know more? Fill in the form below and a member of our team will contact you shortly. Alternatively call us on 01743 811 811 or email us on info@beaverbridges.co.uk

      • Request a Call Back
      Beaver Bridges WCS ISO 14001 logo Beaver Bridges WCS ISO 45001 logo Beaver Bridges WCS ISO 9001 logo Beaver Bridges Avetta Logo Beaver Bridges Ceca logo Beaver Bridges Made in Britain logo Beaver Bridges CHAS Beaver Bridges Constructionline logo Beaver Bridges SCCS logo Beaver Bridges FORS logo Beaver Bridges Risqs logo
      Request a Survey