From concept to completion, Beaver Bridges offers end-to-end services for permanent and temporary bridge projects. Whether you're planning new infrastructure or upgrading existing assets, our in-house teams deliver compliant, cost-effective, and future-ready solutions — on time, every time.
From national infrastructure to private developments, Beaver Bridges supports a wide range of sectors with bespoke bridging solutions. Our experience spans highways, rail, energy, and public sector projects — as well as private estates and commercial schemes. Wherever your project sits, we have the tools, talent, and track record to deliver.
Explore the wide range of bridge solutions delivered by Beaver Bridges. We design and build both permanent and temporary structures for projects of all sizes. With strong engineering expertise and a practical approach, we provide safe, reliable and compliant bridge systems tailored to each project’s needs and environment.
From remote landscapes to live rail environments, Beaver Bridges thrives in complex settings where others hesitate. Our in-house team brings together decades of engineering expertise, ensuring we meet challenges head-on — safely, sustainably, and without compromise.
The requirement was for a 5m x 3m hardwood timber bridge with a 20kN/m2 loading, weighing 2800kg. The purpose of the bridge was to provide access predominantly to pedestrians, whilst also allowing for equestrian and small vehicle use. An all timber (hardwood) finish with galvanised fixings and anti-skid strips fitted to the deck completed the full structure.
In preparation for the installation, Beaver Bridges liaised with adjacent landowners and users of the nearby Salt Hill Activity Centre. This communication was vital to ensure the safe and meticulous planning of all vehicle movements on site during the installation.
Beaver Bridges prepared the site. The site also included trained plant operators and a banksman who controlled and guided all site plant and vehicles, including deliveries to site.
Thorough excavation was completed to the pre-determined level and checked with the client ahead of lifting the concrete blocks into the final position. The bridge was delivered in one piece, installed and fixed into position using a chemical anchors system.