Skip to content

Rail Bridges

Rail-Compliant Bridge Solutions with Full ASPRO and Possession Coordination

Beaver Bridges delivers safe, efficient, and fully engineered bridge solutions for the rail sector — supporting access, overbridge, and asset protection projects on and around the UK rail network.

With experience working under Network Rail ASPRO protocols, we provide full support for third-party approvals, GRIP/PEST stages, and possession planning. Whether your project involves crossing the tracks or working adjacent to them, our team ensures full compliance, minimum disruption, and seamless delivery.

Rail Overbridges & Underpasses

Permanent vehicle and pedestrian bridges spanning live railways or sidings — designed to Network Rail clearance and load requirements.

01

Asset Protection (ASPRO) Liaison

We manage all third-party submissions, drawings, method statements, and stakeholder engagement required for ASPRO approval.

02

Temporary Works & Access Platforms

Modular bridges for temporary access across or near rail lines — installed during planned possessions or off-peak windows.

03

Utility & Maintenance Access Bridges

Bridges enabling safe rail corridor access for O&M teams, contractors, or utility infrastructure — including non-conductive options.

04

Site Coordination & Possession Works

We work with Principal Contractors, ASPRO teams, and subcontractors to deliver bridges safely within time-constrained possession windows.

05

Our Rail-Specific Capabilities

Why Beaver Bridges for Rail?

✔ Experienced with Network Rail Protocols

We’ve successfully delivered projects under ASPRO frameworks, ensuring early compliance and streamlined technical approvals.

✔ Safety-First, Rail-Ready Teams

Our installation crews hold relevant PTS and safety certifications and are experienced with working in controlled rail environments.

✔ Temporary & Permanent Rail Solutions

Whether a short-term access requirement or a permanent structure, we can advise, supply, install, and certify rail-adjacent bridges.

✔ End-to-End Support

We provide everything from GRIP-stage drawings and load calculations to delivery, lift planning, and civil works — all in-house.

Beaver Bridges rail bridge Willingdon Tree

Frequently Asked Questions

Do you liaise with Network Rail on our behalf?

Yes — we manage all third-party ASPRO communications, design submissions, and technical responses during the approval process.

Can you work within all rail possessions?

Absolutely. We’re experienced in night and weekend possession works and can plan installations to meet tight access windows.

Are your bridges rail-certified or accredited?

Our designs follow relevant Network Rail, Eurocode, and BS standards. We provide all structural certification and documentation required for approval.

Rail Bridge at Paddington Station
Rail Bridge at Paddington Station
Amey Ltd
balfour
bam
clarke telecom
galliford
george leslie
jackson
national highways
sisk
skanska
the-newt
Amey Ltd
balfour
bam
clarke telecom
galliford
george leslie
jackson
national highways
sisk
skanska
the-newt
ENGINEERED TO INDUSTRY STANDARDS
DESIGNED IN THE UK
FULLY INSURED

Ready to Start a Rail-Adjacent Bridge Project?