From concept to completion, Beaver Bridges offers end-to-end services for permanent and temporary bridge projects. Whether you're planning new infrastructure or upgrading existing assets, our in-house teams deliver compliant, cost-effective, and future-ready solutions — on time, every time.
From national infrastructure to private developments, Beaver Bridges supports a wide range of sectors with bespoke bridging solutions. Our experience spans highways, rail, energy, and public sector projects — as well as private estates and commercial schemes. Wherever your project sits, we have the tools, talent, and track record to deliver.
Explore the wide range of bridge solutions delivered by Beaver Bridges. We design and build both permanent and temporary structures for projects of all sizes. With strong engineering expertise and a practical approach, we provide safe, reliable and compliant bridge systems tailored to each project’s needs and environment.
From remote landscapes to live rail environments, Beaver Bridges thrives in complex settings where others hesitate. Our in-house team brings together decades of engineering expertise, ensuring we meet challenges head-on — safely, sustainably, and without compromise.
The current bridge was approximately 100 years old and after a structural assessment last year it was discovered that it had deteriorated quite badly and was no longer structurally stable and needed replacing. As an historic environmental location, it was important that the new bridge resembled the old one and fitted in with the surroundings.
The new bridge was constructed from Ekki Timber Grade D70 which is a very resilient and durable timber with a long lifespan and is useful in locations that are open to harsh weather conditions particularly relevant with Porchester proximity to the coast.
Beaver Bridges also installed mesh parapet infills to increase safety and make it code compliant. We also used a flitch plate to connect the posts to the main beams and this made the structure more secure. The deck on the old bridge had no anti slip inserts so these were also added to CD353 Design criteria.
The client was delighted with the completed structure and we have received many compliments and interest from both them and the public.