Full Turnkey Solution, Newton Blossomville – Milton Keynes, England

Programme

The structures were craned into position using a 300t grove. The bridges were completed to be uniform in finish. A 36m, a 18.7m and a 5m structure all constructed in steel and timber, with a hardwood finish. All steelwork was coated with HA Type II Alternative Paint System, FSC hardwood all fixings galvanised.

Environmental and ecology factors were carefully managed throughout the duration of these works. This included the presence of otters, bats and newts, which had to be considered within our programme and dealt with in an appropriate manner.

For this full turnkey solution project, Beaver Bridges completed all work to the set criteria. Work was also completed on time and all tasks were performed safely.

OUR CORE VALUES

Understand Our Clients
Deliver On Time And on Budget
Show Our Passion
Think Differently And Innovate
Learn Continuously
Communicate Openly
Seek Feedback
Everyone Home Safe Every Day
Maximum Effort
Enquire Now
Would you like to know more? Fill in the form below and a member of our team will contact you shortly. Alternatively call us on 01743 811 811 or email us on info@beaverbridges.co.uk

      • Request a Call Back
      Beaver Bridges WCS ISO 14001 logo Beaver Bridges WCS ISO 45001 logo Beaver Bridges WCS ISO 9001 logo Beaver Bridges Avetta Logo Beaver Bridges Ceca logo Beaver Bridges Made in Britain logo Beaver Bridges CHAS Beaver Bridges Constructionline logo Beaver Bridges SCCS logo Beaver Bridges FORS logo Beaver Bridges Risqs logo
      Request a Survey