Footbridge Replacement – Llys Lane, Shropshire, England

Programme

The Structure

The 21.5m by 2m curved steel beam footbridge had a HA Type II paint system with a polyurethane resin anti-skid deck surface. The parapets measured 1.25m in height and consisted of 40 galvanised mesh panels with a pedestrian handrail.

The Project

This replacement project was a challenging one. A road closure and traffic management system were put in place whilst the existing redundant footbridge was removed in one piece using a 55t AC55 Road Rail Crane. Earlier enabling works freed the footbridge from its footings. The AC55 Road Rail Crane was again utilised to reinstate the footbridge replacement in one preassembled piece.

OUR CORE VALUES

Understand Our Clients
Deliver On Time And on Budget
Show Our Passion
Think Differently And Innovate
Learn Continuously
Communicate Openly
Seek Feedback
Everyone Home Safe Every Day
Maximum Effort
Enquire Now
Would you like to know more? Fill in the form below and a member of our team will contact you shortly. Alternatively call us on 01743 811 811 or email us on info@beaverbridges.co.uk

      • Request a Call Back
      Beaver Bridges WCS ISO 14001 logo Beaver Bridges WCS ISO 45001 logo Beaver Bridges WCS ISO 9001 logo Beaver Bridges Avetta Logo Beaver Bridges Ceca logo Beaver Bridges Made in Britain logo Beaver Bridges CHAS Beaver Bridges Constructionline logo Beaver Bridges SCCS logo Beaver Bridges FORS logo Beaver Bridges Risqs logo
      Request a Survey