Bridge Build Package – Newton Blossomville, Milton Keynes, England

Programme

The Structure

The structures were craned using a 300t grove and the bridges were manufactured to be uniform in finish.  The 36m, 18.7m and 5m structures were constructed in steel and timber, all steelwork coated with HA Type II alternative paint system, FSC hardwood and all fixings galvanised.  Sympathy for the environment and ecology were other factors carefully managed, e.g. the presence of otters, bats and newts.

All criteria were met, on time and performed safely.

OUR CORE VALUES

Understand Our Clients
Deliver On Time And on Budget
Show Our Passion
Think Differently And Innovate
Learn Continuously
Communicate Openly
Seek Feedback
Everyone Home Safe Every Day
Maximum Effort
Enquire Now
Would you like to know more? Fill in the form below and a member of our team will contact you shortly. Alternatively call us on 01743 811 811 or email us on info@beaverbridges.co.uk

      • Request a Call Back
      Beaver Bridges WCS ISO 14001 logo Beaver Bridges WCS ISO 45001 logo Beaver Bridges WCS ISO 9001 logo Beaver Bridges Avetta Logo Beaver Bridges Ceca logo Beaver Bridges Made in Britain logo Beaver Bridges CHAS Beaver Bridges Constructionline logo Beaver Bridges SCCS logo Beaver Bridges FORS logo Beaver Bridges Risqs logo
      Request a Survey