Pedestrian Bridge – A1L2B Catterick Marine Parkway, Yorkshire, England

Programme

As Prime Contractor, Beaver Bridges were responsible for planning, managing, monitoring, coordinating and controlling our works including health and safety and welfare on-site in conjunction with the requirements of the CDM regulations 2015.

The pedestrian bridge was shipped from the factory near Toulouse as individual parts, and Beaver Bridges rented a yard opposite a motorway service area to take delivery and build the bridge up into two sections in skeleton form (without deck).

During a 24-hour motorway closure, the Beaver Bridges team loaded the sections onto trucks and drove them up the closed motorway to the bridge location.

A 300-tonne crane was rigged on the motorway and used to offload the two sections. Great care was taken by the Beaver Bridges team to level and line the first section, using timber cribs and shims to ensure it was perfectly level and plumb. We then lifted the section and effected the connection. The chords were added at the splice location, and the bridge re-slung and lifted into place.

OUR CORE VALUES

Understand Our Clients
Deliver On Time And on Budget
Show Our Passion
Think Differently And Innovate
Learn Continuously
Communicate Openly
Seek Feedback
Everyone Home Safe Every Day
Maximum Effort
Enquire Now
Would you like to know more? Fill in the form below and a member of our team will contact you shortly. Alternatively call us on 01743 811 811 or email us on info@beaverbridges.co.uk

      • Request a Call Back
      Beaver Bridges WCS ISO 14001 logo Beaver Bridges WCS ISO 45001 logo Beaver Bridges WCS ISO 9001 logo Beaver Bridges Avetta Logo Beaver Bridges Ceca logo Beaver Bridges Made in Britain logo Beaver Bridges CHAS Beaver Bridges Constructionline logo Beaver Bridges SCCS logo Beaver Bridges FORS logo Beaver Bridges Risqs logo
      Request a Survey