SSE, Inverness

Programme

Excavation works, Foundations, Crane lift, Build and install.

The new structure was a single span steel monocoque construction with load distribution through deck plates above and below the main structural members.  It was installed on concrete foundations which were constructed of pre-cast blocks built up to 4m high. The bridge itself consisted of two 9m long x 3m wide bridge decks complete with demountable handrails.  Each deck was positioned to ensure wheel loads from delivery vehicles were best spread through each bridge section.  The site works element were completed in 7 days
Beaver Bridges supplied all resources including staff, machinery, equipment, tools and materials for these works.  The projected was completed successfully, on time and in a professional manner.