Pedestrian Replacement (FRP). Towcester.

Programme

The Structure

After successful removal of the old structure an assessment of the footings took place to ensure they had not been damaged during the removal of the old bridge. The new footbridge deck was delivered to site in one piece and set down in the compound area. The deck was fixed using a chemical anchor system, it was slung into position to enable marking out and lining up holes for drilling. After deck install was complete the parapets and rails were fitted to the predrilled holes and fixed securely. The site was cleared of all plant and machinery. Any waste, materials and litter were disposed of in the skip provided leaving the site clean, tidy and safe. BB completed this project in a professional and safe manner, on budget, on time and to the client’s satisfaction.

Enquire Now
Would you like to know more? Fill in the form below and a member of our team will contact you shortly. Alternatively call us on 01743 811 811 or email us on info@beaverbridges.co.uk
  • Request a Call Back
Request a Survey