Footbridge over Canal, Hounslow

Programme

Access was limited and works were carried out in a highly populated area, an area which was also subject to busy canal boat traffic.
Negotiations were held with the Canals and River Trust and there was careful consideration and management of this project to ensure as little as possible disruption or inconvenience was caused to local residents.  The site required vegetation clearance and we handled the environment with great sensitivity.

Lifting Operations – 500te Crane situated on adjacent land, overreaching the canal.
Installation – bridge was landed and joined to existing towpath.