Footbridge Removal, London.

Programme

Beaver Bridges had been contracted to remove and dispose of a temporary footbridge and staircase at the Abbey Wood station.
The main scope of works included the removal and disposal of a 3-flight staircase, 16 metre span x 4.9 metre bridge and support trestles.

Beaver Bridges provided a complete service with all lifts planned and executed safely and on time. The fully competent onsite team and crane crew ensured that all structures were removed in the most efficient, controlled way possible. The project involved particularly challenging crane lifts given the close proximity of the BT building.

All criteria were met, on time and performed safely.