Manufacture
Beaver Bridge designs are primarily all steel construction – fabricated from our own proven design technical C.A.D drawings.
Fully welded seams – providing strength, stability and peace of mind
Coded British Standard fabrication
Options:
Non slip deck
Glass reinforced plastic (GRP)
Galvanise
Timber deck & handrails
• Bridges are designed in accordance with BS 5400-3:2000 code of practise for the design of steel bridges
• All pedestrian parapets are designed in accordance with Technical Approval Schedule (TAS) in BD2 Fully welded seams to BS EN 287-1 2004 Quality control
Quality Conrol
• All aspects of our bridge projects are independently verified to ensure quality standards are reached
• Welding
• All our welders are coded to BS EN 287-1 2004-1 2004 Welder Approval
• 30% of all welds are tested using the die-penetrative method
• All welds are carried out using Bohler certified wire
• All welds are checked by Pearsall Training and consultancy
Paint
• Blast cleaning and paint applications are checked by Chris Joyce of STP coatings
• Chris Joyce holds an Institute of Corrosion Level 2 certificate